What’s involved in your annual PPM inspection?
Your local Cryospeed Sales and Service Operator will plan and carry out a full audit of your pressurised vessel, supplying and itting any replacement parts as set out in the maintenance scheme.
This includes checking vessel safety devices and labelling, recording and repairing any defects to ensure the vessel is in safe and good working order and compliant with current legislation.
What’s involved in the inspection in line with the Written Scheme of Examination (WSE)?
At the designated interval your local Cryospeed Sales and Service Operator will carry out an examination in line with the WSE for that particular vessel. This includes replacing the vessel pressure relief valves and carrying out all the essential checks included in the annual inspection, again recording and repairing any defects.
Once an inspection audit is complete and remedial work carried out, you will receive all the necessary documentation and certificates for your records, giving you the peace of mind that your legal requirements have been met.